If the actual information at the lifting site does not tally with the lifting plan, you should stop the operation until the plan has been updated and re-approved.You should never deviate or vary from the approved lifting plan.Throughout the course, we will cover each section of the lift plan, including load. Input the weight and dimensions of the object youre lifting. 1, and the UKs Lifting Operations and Lifting Equipment Regulations. Sketch of the lifting zone (showing position of lifting equipment, crew and load) and Manitowoc cranes are available in the 3D Lift Plan database, allowing you to simulate your.Requirements to erect or dismantle lifting equipment (if any). Lifting crew (including their roles and competencies).Your lifting plan should include, but not limited to, the following elements: load capacity chart, range diagram, rigging method)įor complex lifts, additional engineering design efforts are necessary to ensure that the lifting operation is conducted safely.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |